Contract Name: Lymington Hospital
Contract Sum: £29,694,000
Contract Period: 104 Weeks
Architect: Murphy Philipps
Client: Ryhurst Ltd / Hampshire PCT
The new Community Hospital is a PFI project for our Client, Ryhurst Limited and the end user, Hampshire PCT
The Hospital is constructed on a sensitive site in Lymington, adjacent to the SSSi and adjoining the River Lymington and incorporates significant works to overcome the possibility of flooding.
The Hospital is two and three storeys high, with a 12,000m2 floor area, incorporating DTC, EAU and MIU areas, two operating theatres, two endoscopy suites, imaging suites and audiology suites. The Hospital has 99 bed spaces with a large proportion being single rooms, spread over rehabilitation, surgical, medical and birthing centre wards.
The building construction consists of:
The Hospital has a comprehensive mechanical and electrical service installation, consisting of comfort cooling, air conditioning to critical areas and medical gases.
The scheme was completed in November 2006